River tidal bore subsection real time early warning method
A tidal and river technology, applied in the field of automation, can solve problems such as disconnection, waste of manpower and material resources, arrival time and water level height error.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] For the real-time early warning of the Qiantang River tide, the specific implementation steps are as follows:
[0027] 1. Along the Qiantang River from Ganpu and Yanguan in Jiaxing to the 850 Pantou, Cangqian, Xiasha Bridge, Qibao, City Balcony, Gate, and Wenjiayan within the scope of Hangzhou City, the front of Hangzhou City and the city of Hangzhou The river road is divided into 9 sections.
[0028] 2. Query the tide arrival time of these 10 points in the past 15 years, and use the interpolation method to fill in some points without hydrological data (no hydrological station locations).
[0029] 3. Time T from tide water to Xiasha Bridge k-1 =14:00,
[0030] S k : Seven Forts
[0031] S k-1 : Xiasha Bridge
[0032] S k-2 : Cangqian
[0033] T k-1 : The time when the tide reaches Cangqian Hydrological Station
[0034] Then you can get the estimated time when the tide reaches Seven Forts:
[0035]
[0036]
[0037] 4. Time T when we arrived at Qibao yes...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com