A technology of plantation and water collection, applied in the field of drought resistance, can solve the problems of poor growth and development of trees, no water collection surface, insufficient water supply, etc., achieve a breakthrough in the low survival rate of afforestation, improve the survival rate and growth, and ensure the survival rate Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Implement the drought-resistant method of plantation and tending in the arid area of Gansu, the specific implementation method steps are as follows:
[0045] (1), Jianshui collection system (as shown in Figure 1)
[0046] Use existing roads, or slope along the beams on the barren slope to the direction of confluence, and build the road confluence surface. When the existing road is used as the road collecting surface, the lateral ratio of the road collecting surface is 1 / 30-1 / 50, and the vertical ratio is 1 / 50-1 / 100.
[0047] Close to the collecting surface of the road, according to the perimeter of the collecting surface of the road, build a diversion channel with masonry structure, the diversion channel is 0.5m wide and 0.6m deep.
[0048] Construction of water storage facilities: build a water cellar with an interval of 400-500m and a distance of 5-10m from the aqueduct, as shown in Figure 2. 0.7m, built with bricks and 0.3-0.5m above the ground, the diameter of t...
Embodiment 2
[0059] In the arid areas of the north, the drought-resistant method implemented in plantation and tending, the steps are as follows:
[0060] (1), Jianshui collection system:
[0061] Where there are beams on the barren slope, the road collecting surface shall be built along the beam to the direction of confluence, which must be compacted. The dry bulk density of the compacted collecting surface shall not be less than 1.5t / m 3 . All the other are with embodiment 1;
[0062] The construction of water storage facilities: with embodiment 1.
[0063] (2) Construct the barren slope collecting surface (as shown in Figure 1).
[0064] Lay a plastic film on the tamped collecting surface, and lay a polyvinyl chloride film with a thickness of 0.2 mm on the collecting surface, and compact it with stones around; the rest are the same as in Example 1.
[0065] (3), the building of collecting pit: with embodiment 1
[0066] (4), water storage and moisture conservation measures: with em...
Embodiment 3
[0068] The construction of embodiment 3 water storage system
[0069] (1) Next to the diversion channel of the road collecting surface with little rainfall (rainfall of 10 mm within 24 hours or less than 2.5 mm within one hour), the workover type water cellar (see Figure 2), single Cellar capacity is 30~50m 3 .
[0070] The cellar body consists of three parts: cellar tube, dry cellar and water cellar. The dimensions of each part are as follows:
[0071] Cellar tube (upper ground cellar mouth, for water intake): diameter 0.6-0.7m, depth 1.5-2m;
[0072] Dry cellar (the part that does not store water): the upper part is connected with the cellar tube, with a depth of 2-3m. The diameter gradually enlarges downwards, until the diameter of the loose plate is 3-4m;
[0073] Cellar body (water storage part): 3-5m deep, the diameter gradually decreases from the loose plate downwards, and the diameter at the bottom is 2-3m;
[0074] Pit mouth: 0.6-0.7m in diameter, made of bricks ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com