Method and system for identifying construction progress of underground excavation station

A technology of construction progress and identification method, applied in the field of communication, can solve the problems of information transmission lag, unsuitable underground excavation of subway stations, and inability to track construction progress information in real time, saving time and labor, improving refined management and digital management Effect

Active Publication Date: 2020-10-16
BEIJING RAIL & TRANSIT DESIGN & RES INST
View PDF15 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The construction progress management system in the prior art adopts the method of reporting construction progress based on two-dimensional vector graphics, which is only applicable to the progress management of railway tunnels, railway subgrades and railway bridges, and railway tunnels, subgrades and bridges are all simple linear structures , so it is not suitable for underground excavation of subway stations with complex construction content
In addition, although the construction progress management system in the existing technology has the functions of data reporting, data review and storage, it still needs manual filling, review and storage. The construction progress information cannot be tracked in real time, and there is a lag in the transmission of information. shortcoming

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system for identifying construction progress of underground excavation station
  • Method and system for identifying construction progress of underground excavation station
  • Method and system for identifying construction progress of underground excavation station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0043] The embodiment of the present invention provides a method for identifying the construction progress of underground excavation stations, see figure 1 ,include:

[0044] S1. Create a building information model of the construction site of the underground excavation station;

[0045] S2. Receive the location data related to the construction progress collected by the positioning system, and convert the location data into construction progress data; the positioning system is arranged at the construction site of the underground excavation station;

[0046] S3. Control the display state of the building information model according to the construction progress data, and display the construction progress of the underground excavation station in three dimensions.

[0047] It should be noted that this embodiment creates a building information model BIM of the construction site of the underground excavation station, and develops a software identification platform based on BIM-GIS te...

Embodiment 2

[0081] The embodiment of the present invention also provides an identification system for the construction progress of the underground excavation station, which can realize all the processes of the above identification method for the construction progress of the underground excavation station, such as image 3 shown, including:

[0082] The positioning system 31 is arranged at the construction site of the underground excavation station, and is used to collect position data related to the construction progress;

[0083] A data interface 32, configured to receive the location data and convert the location data into construction progress data;

[0084] The software identification platform 33 includes a model creation module and a display module; the model creation module is used to create the building information model of the construction site of the underground excavation station; the display module is used to control the building information model of the building information mo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a recognition method and system for underground excavation station construction progress, and the method comprises the steps: S1, constructing a building information model of an underground excavation station construction site; S2, receiving the position data which is correlated with the construction progress and is collected by a positioning system, and converting the positioning data into construction progress data, wherein the positioning system is arranged on the underground excavation station construction site; S3, controlling the display state of the building information model according to the construction progress data, so as to achieve the three-dimensional display of the construction progress of an underground excavation station. The invention also discloses a recognition system for the underground excavation station construction progress. The method and system can collect and recognize the construction progress information of the underground excavationstation in real time, and is high in informationization level.

Description

technical field [0001] The invention relates to the field of communication technology, in particular to a method and system for identifying construction progress of a submerged station. Background technique [0002] In the informatization requirements of key projects in the "2016-2020 Construction Industry Informatization Development Outline" promulgated by the Ministry of Housing and Urban-Rural Development, it is clearly required to speed up the application of BIM (Building Information Modeling) technology in the design and construction of urban rail transit projects. The application in the project promotes the sharing of multi-dimensional building information models by all participating parties for project management. More than 20 cities across the country have carried out BIM technology applications of different depths and scales in urban rail transit projects, and are gradually transitioning to BIM-based construction management applications. The combination of BIM, GIS...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q50/08G06T17/00G06F30/20G06F30/13H04W4/029H04W4/021
CPCG06F30/20G06Q50/08G06T17/00H04W64/00
Inventor 金淮于海霞张波王辉周明科张鑫马骉苑露莎王浩任
Owner BEIJING RAIL & TRANSIT DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products