Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Earthwork volume estimation system and estimation method based on automatic route selection of construction road in wind farm

A technology for wind farms and earthworks, applied in the field of wind power development and lean development of the wind power market, can solve the problems of less three-dimensional terrain data, no reports, and inability to fully meet the requirements of pathfinding, so as to improve construction efficiency, improve accuracy, Reduce the cost of manpower and material resources and the effect of time consumption

Pending Publication Date: 2018-04-06
BEIJING TIANRUN NEW ENERGY INVESTMENT CO LTD
View PDF16 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The A* algorithm is a best-first algorithm. However, due to some specific constraints, if you want to use the fastest method to find the shortest path and the optimal path of the wind farm state space search, the algorithm is The path-finding requirements cannot be fully met.
The construction road in the wind farm needs to choose an area with relatively convenient traffic, which is conducive to the transportation of construction equipment materials and large-scale equipment, and reduces the investment in the road to the station. There are few applications, and the estimated value of construction earthwork based on the automatic selection of construction roads in wind farms has not been reported.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Earthwork volume estimation system and estimation method based on automatic route selection of construction road in wind farm
  • Earthwork volume estimation system and estimation method based on automatic route selection of construction road in wind farm
  • Earthwork volume estimation system and estimation method based on automatic route selection of construction road in wind farm

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] This embodiment is mainly aimed at the construction of a wind farm for wind power generation in a certain city in Xinjiang, the design of the construction road for the wind power booster station and the estimation of the construction earthwork after the location of the booster station. The equipment that needs to be transported on the construction road on the site mainly includes the main wind turbine, hub, blade and tower; the equipment and construction materials of the booster station mainly include stones, sand, cement, steel, machinery materials, poles, etc. The equipment used at the assembly site is bulky, the amount of raw materials is large, and the transportation is extremely inconvenient. Therefore, the designed road must consider the slope of the road to ensure the successful traction and transportation of the equipment.

[0052] See figure 1 , Is an earthwork estimation system based on automatic route selection of construction roads in a wind farm according to a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an earthwork volume estimation system based on automatic route selection of a construction road in a wind farm. The system comprises (1) a data collector, wherein the data collector is used for collecting complete three-dimensional terrain data of a road geographic scene in the wind farm; (2) a digital terrain model generator, wherein the digital terrain model generator is used for building a wind farm three-dimensional field model seamlessly registered based on a terrain model; (3) a route planner, wherein based on an A* routing algorithm, at least three parameters of the shortest distance, the optimal slope and the booster station construction road earthwork volume are combined, a construction line design scheme is self-adaptively generated; (4) a booster station position calculator, wherein the booster station position calculator is used for calculating the average shortest distance reaching each fan position on the basis that the design scheme of the shortestconstruction road is acquired, and determining the optimal selection site of the booster station by means of the minimum average distance algorithm; (5) a construction earthwork volume calculator, wherein the construction earthwork volume calculator is used for intelligently estimating the construction earthwork volume of construction road and booster station building. The invention further discloses a corresponding earthwork volume estimation method of construction road and booster station building.

Description

Technical field [0001] The invention relates to the technical field of wind power development, in particular to the site selection of a booster station during the construction of a wind farm road in the wind power industry, and belongs to the technical field of lean development of the wind power market. Background technique [0002] Wind farms are the basic operation and management unit of wind power enterprises, and the operation and management of wind farms directly affects the benefits of wind power enterprises. With the continuous expansion of the installed capacity of various wind power enterprises and the continuous increase in the number of wind farms, the original wind farms such as passive, intermittent and extensive operation and maintenance methods have slowly been transformed into active, continuous and lean operation and maintenance methods. In the process of transformation, various unique digital wind farm concepts have been proposed, and some demonstration projects...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F17/50G06Q10/04G06Q50/06G06T17/05
CPCG06Q10/047G06Q50/06G06T17/05G06F30/00Y02A90/10
Inventor 张越牛清华谢潇王鸿田王乾坤朱庆许洪基
Owner BEIJING TIANRUN NEW ENERGY INVESTMENT CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products