Test method for performing DC reboot on server based on WOL function
A test method and server technology, applied in the detection of faulty computer hardware, etc., can solve problems such as not easy to reproduce, and achieve the effects of saving test costs, wide application range, and strong practicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Please refer to figure 1 , a test method for DC restarting a server based on the WOL function, including:
[0032] Step S101: Connect the control end to the network port of the server under test at the end under test.
[0033] Step S102: Turn on the WOL function on the server to be tested.
[0034] Step S103: Obtain the MAC address and IP address of the network port used by the server to be tested.
[0035] Step S104: Copy the shutdown command to the startup folder in the operating system of the server to be tested.
[0036] Step S105: The server to be tested starts up and enters the operating system, waits for a specified time, and automatically executes a shutdown command.
[0037] Step S106: The control terminal monitors the on / off state of the server to be tested. If it is in the off state, it will wait for a specified time before proceeding to step S107; if it is in the power-on state, it will automatically execute the shutdown command after waiting for a specif...
Embodiment 2
[0041] Please refer to figure 2 , a test method for DC restarting a server based on the WOL function, including:
[0042] Step S201: Connect the control end to the network port of the server under test at the end under test.
[0043]Step S202: Turn on the WOL function on the server to be tested.
[0044] Step S203: Obtain the MAC address and IP address of the network port used by the server to be tested.
[0045] Step S204: Copy the shutdown command to the startup folder of the server operating system to be tested;
[0046] Step S205: Copy the WOL function command to the operating system of the control terminal.
[0047] Step S206: The server to be tested starts up and enters the operating system, waits for a specified time, and automatically executes a shutdown command.
[0048] Step S207: The control terminal monitors the on / off state of the server to be tested. If it is in the off state, it will wait for a specified time before proceeding to step S208. If it is in the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com