Power grid accident risk early warning method and device
A technology for early warning of risks and grid accidents, applied in the direction of circuit devices, electrical components, AC network circuits, etc., can solve problems such as inconformity with scheduling operations, ambiguity, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] figure 1 A flow chart of a method for early warning of a power grid accident risk provided by an embodiment of the present invention is shown. The method comprises the steps of:
[0063] Step S102, obtaining line information of each line in the simulated power grid, and selecting a target line from the line information;
[0064] Wherein, the above-mentioned simulated power grid is simulated in a manner corresponding to the predicted fault, and the target line is the line where the predicted fault is located.
[0065] Step S104, extracting the configuration data of the target line, searching the key equipment of the target line and the node information associated with the target line in the configuration data;
[0066] Step S106, search for the selected target line and the key equipment of the target line as the center, and establish an accident set;
[0067] Wherein, the accident set includes lines and nodes having the same nodes as the target line and the key equipm...
Embodiment 2
[0108] On the basis of the above embodiments, the embodiment of the present invention also provides a power grid accident risk early warning device, such as image 3 As shown, the device includes:
[0109] The target line selection module 30 is used to obtain the line information of each line in the simulated power grid, and select the target line from the line information; wherein, the simulated power grid is simulated in a manner corresponding to the expected fault, and the target line is the line where the expected fault is located;
[0110] The information search module 31 is used to extract the configuration data of the target line, and search the key equipment of the target line and the node information associated with the target line in the configuration data;
[0111] The accident set building module 32 is used to search for the selected target line and the key equipment of the target line as the center, and establish an accident set, wherein the accident set includes ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com