Preheating method of dual horizontal wells with equal temperature difference and forced steam circulation in medium and deep reservoirs
A dual-horizontal well, circulation preheating technology, applied in the direction of earthwork drilling, wellbore/well components, production fluid, etc., can solve the problem of difficult to realize the circulation preheating of medium and deep heavy oil reservoirs, and achieve the goal of overcoming the circulation preheating Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0082] Example 1: A sandstone group oil layer in a certain oil reservoir is a sandstone group oil reservoir with a buried depth of 955 meters. The viscosity of degassed crude oil at 50°C is 53450-72340mPa.s, and the thickness of the oil layer is 15 meters. At the end of the vertical well steam huff and puff, Two pairs of horizontal well groups are deployed in the reservoir area, including 2 horizontal steam injection wells, 2 horizontal production wells, and 1 horizontal observation well. The direction of the horizontal wells is basically parallel to the structural line, and the distance between the upper and lower horizontal wells is 5 meters. According to the geological characteristics and crude oil properties of the reservoir, a cyclic preheating test of a double horizontal well pair was carried out.
[0083] The average thickness of the oil layer is greater than 15 meters, and the porosity, permeability, and vertical permeability to horizontal permeability ratio are greate...
example 2
[0088] Example 2: The Guantao Formation oil layer in an oilfield is a medium-deep ultra-heavy oil reservoir with a buried depth of 680 meters. The viscosity of degassed crude oil at 50°C is 147,500-485,400 mPa.s, and the thickness of the oil layer is 80 meters. Before the present invention, the reservoir adopts a double horizontal well combination method, and its production process is divided into two stages of huff and puff and huff and puff preheating. In the huff and puff stage, the lower horizontal well huffs and puffs for four cycles. Two cycles. Periodic oil production and oil-steam ratio are both declining, and the recovery degree is 18%.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com