A method of contemporaneously constructing more than one semi-submersible rig using transverse skidding
A technology of drilling platform, level height, applied in the field of construction of marine buildings
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described below in conjunction with specific drawings. Figures 1-3 show the general arrangement of the shipyard area including the dry dock 4 where two semi-submersible drilling rigs of the present invention are constructed and combined. As shown in Fig. 2 and Fig. 3, the first semi-submersible drilling platform is composed of a first upper hull 1a and a first lower hull 2a. During construction, the first upper hull 1 a is supported by sliding trusses 3 located on land adjacent to the dry dock 4 . The sliding trusses 3 are designed to slide the completed upper hull 1a on the longitudinal sliding beams 5 using longitudinal sliding shoes 6 during the load-out operation.
[0027] As shown in FIG. 1 , the longitudinal sliding beam 5 extends parallel to the longitudinal axis of the sliding truss 3 . The detailed configuration of the unloading and bonding operations is further disclosed in detail in the previous International Publicatio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com