Effectiveness evaluation method for oil producing water injection development
An evaluation method and technology for oil production wells, applied in the fields of production fluid, earthwork drilling and production, wellbore/well components, etc., can solve problems that cannot be quantified, take a lot of time to observe, and have many factors to be eliminated
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] This embodiment provides a method for evaluating the effectiveness of water injection development in oil production wells, including the following steps:
[0048] Step 1) collect monthly production data of all oil production wells in the oil reservoir to obtain daily oil production;
[0049] Step 2) Determine the production time node M that needs to quantify the effective effect of the target oil production well 0 , and the production time node M 0 The actual daily oil production Q n ;
[0050] Step 3) select standard well;
[0051] Step 4) Calculate the initial daily oil production Q of the standard well 0t ;
[0052] Step 5) According to the initial daily oil production Q of the standard well 0t and the standard well at the production time node M that needs to quantify the effective effect 0 Nissan Oil Q 0 , to calculate the effective decline rate D of the standard well 0 ;
[0053] Step 6) Calculate the initial daily oil production Q of the target oil produ...
Embodiment 2
[0060] This embodiment provides a method for evaluating the effectiveness of water injection development in oil production wells, including the following steps:
[0061] Step 1) collecting the monthly production data of all oil production wells in the oil reservoir to obtain daily oil production; the monthly production data of the oil production wells are all monthly production data since putting into production;
[0062] Step 2) Determine the production time node M that needs to quantify the effective effect of the target oil production well 0 , and the production time node M 0 The actual daily oil production Q n ; Among them, the target production well needs to quantify the effective production time node M 0 Not less than 6 months;
[0063] For example, it is necessary to quantify the effective effect of production well A in the 24th production month, M 0 The value is 24, the actual output is Q n .
[0064] Step 3) Select a standard well; a standard well is an effectiv...
Embodiment 3
[0090] A certain water injection development reservoir is selected, and on the basis of Example 2, this embodiment quantifies the effective effect of oil production wells (horizontal wells) in the reservoir according to this method.
[0091] Step 1: Collect monthly production data (daily oil production level) of the reservoir;
[0092] Step 2: Determine the target horizontal well A and the production time node M that needs to quantify the effect 0 = 24 and the actual production output Q at this time node n =6.19t / d;
[0093] Step 3: Select GP0 as the standard well by collecting dynamic monitoring data of reservoir wells and observing the production curves of each production well;
[0094] Step 4: Calculate the initial production of GP0, through data extraction, q 01 =8.37t / d,q 02 =8.22t / d,q 03 =7.77t / d, calculate Q 0t =8.12t / d;
[0095] Step 5: Calculate the effective decline rate D 0 , through data extraction, the standard well production month is 24 daily oil product...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com