Revit secondary development-based foundation pit engineering stability design method and system
A technology of secondary development and design method, which is applied in the direction of calculation, special data processing applications, instruments, etc., and can solve the problems of large-scale and complex foundation pit engineering
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0103] The preferred embodiments of the present invention will be described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.
[0104] The design method of the foundation pit engineering stability based on Revit secondary development of the present invention, comprises the following steps:
[0105] S1. Extract and store valid information of the model established in the Revit platform;
[0106] S2. Checking the stability of the model through a certain mathematical model;
[0107] S3. Feedback the stability result obtained from the analysis to the client terminal.
[0108] In said S2, the stability of the foundation pit model includes overall stability, pit bottom anti-uplift stability, and anti-overturning stability;
[0109] The overall stability of the foundation pit model is checked by t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com