Building hoist operation simulating system and operation method thereof
A technology for a construction elevator and a control system, applied in the elevator field, can solve the problems of construction enterprise operation progress, increase enterprise staffing, construction elevator damage, etc., and achieve the effect of shortening the training period, reducing the consumption of manpower and material resources, and saving costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] figure 1 It is a structural schematic diagram of the construction elevator simulation control system of the present invention.
[0033] Such as figure 1 As shown, the present invention provides a construction elevator simulation control system, including: operating platform 1, transparent curtain 2, projector 3, controller 4, computer 5, audio equipment 6 and construction elevator cage 7, and operating platform 1 , computer 5, and audio equipment 6 are all installed in the construction elevator cage 7; the computer 5 is internally provided with a construction elevator simulation control system 501, which is connected with the controller 4, projector 3, and audio equipment 6 respectively; , which is consistent with the platform of the construction elevator and connected with the controller 4; the transparent curtain 2 is close to the front of the elevator cage 7, and the projection light path of the projector 3 is aligned with the transparent curtain 2 for displaying th...
Embodiment 2
[0041] figure 1 It is a structural schematic diagram of the construction elevator simulation control system of the present invention.
[0042] Such as figure 1As shown, the present invention provides a construction elevator simulation control system, including: operating platform 1, transparent curtain 2, projector 3, controller 4, computer 5, audio equipment 6 and construction elevator cage 7, and operating platform 1 ,, computer 5, and audio equipment 6 are all installed in the construction elevator cage 7; the computer 5 is internally provided with a construction elevator simulation control system 501, which is connected with the controller 4, projector 3, and audio equipment 6 respectively; 1. It is consistent with the platform of the construction elevator and connected with the controller 4; the transparent curtain 2 is closely attached to the front of the elevator cage 7, and the projected light path of the projector 3 is aligned with the transparent curtain 2, which is...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com