Novel construction lofting method under invisible condition of known points
A technology with known points and new methods, which is applied in the new field of construction stakeout under the condition that the known points are not visible, and can solve the problems of difficult stakeout, changes in visibility, and narrow construction sites.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The content of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0047] 1) Condition Description
[0048] Such as figure 1 Therefore, point A and point B are two known points around the site. However, due to the rapid changes in urban construction, it is difficult to communicate between AB and AB. The construction site needs to calibrate the F point and G point pile positions. Since AB is not visible, it is difficult to stake out using the commonly used polar coordinate method. At the same time, due to the limitation of the site conditions, it is difficult to find one that can communicate with both A and B at the same time, so a suitable temporary working base point E is determined by the resection method. Moreover, construction units generally do not configure GPS equipment. Therefore, how to use conventional instruments to accomplish this task requires the design of a new stakeout method. The present invent...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com