Oil well horizontal well oil casing co-injection double seal single card volume fracturing string and fracturing method
A volume fracturing, double-sealing and single-card technology, applied in wellbore/well components, production fluids, earth-moving drilling, etc., can solve the problems of difficult to increase construction displacement and large fluid friction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] In order to make the double-seal and single-chassis staged fracturing process not only suitable for tubing injection fracturing construction, but also suitable for simultaneous injection and fracturing of the tubing annulus, the present invention provides a double-seal single-chassis double-seal and single-chassis co-injection type for oil well horizontal wells and casings Volumetric fracturing strings, such as figure 1 As shown, the tubing 9 is included, and the end of the tubing 9 is sequentially connected with a packer 5, a check valve 6, an eye tube 7 and a guide centralizer 8, and a pilot injector 4 is connected between the packer 5 and the tubing 9; The packer 5 and the second packer 3 are expansion packers, and the third packer 2 is a mechanical packer.
[0022] The oil pipe 9 is connected in series with the second packer 3, the third packer 2 and the annular injection valve 1, the second packer 3 is located above the pilot injector 4, and the third packer 2 is l...
Embodiment 2
[0025] On the basis of the foregoing embodiments, the present invention proposes a fracturing method, comprising the following steps,
[0026] First check the state of the wellbore before the construction. The fracturing method proposed by the present invention is applied to the horizontal wells of the oil wells that have been constructed, that is, the connection channels between all construction intervals and casings have been opened; For perforation operation, the perforating gun can be sent to the design position by means of conventional tubing transmission, and perforation operation can be performed on all intervals of the well at one time.
[0027] Next follow the steps below to work:
[0028] 1) Connecting the pipe string and running in the drill: connect the pipe string according to the structure in the above embodiment, and determine the position of each packer according to the length of the interval to be fractured in the oil and gas well, so that the third packer 2 a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com