A remote power consumption control method, system and remote power consumption management server
A technology of power consumption management and power control, applied in the direction of electrical program control, comprehensive factory control, etc., can solve problems such as inability to control power consumption equipment at precise timing, and achieve the effect of improving user experience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] like figure 1 As shown, the present invention provides an embodiment of a remote power consumption control method, including the following steps:
[0039] Step 102, obtaining the scheduled control time for electric equipment preset by the user terminal;
[0040] Step 104, measuring the network delay with the power consumption management terminal;
[0041] Step 106, calculating the sending time of sending the control command to the power consumption management terminal according to the reservation control time and the network delay;
[0042] Step 108, when the sending time is reached, send the control instruction to the power consumption management terminal.
[0043] Specifically, step 106 includes: calculating the difference between the reservation control time and the network delay of a preset multiple, and using the difference as the sending time, that is, T=T c -NT d , where T is the sending time, T c Control time for appointment, T d is the network delay, and ...
Embodiment 2
[0060] like figure 2 As shown, the present invention also provides an embodiment of a remote power consumption control method, including the following steps:
[0061] Step 202, obtaining the scheduled control time for the electrical equipment preset by the user terminal;
[0062] Step 204, measuring the network delay with the power consumption management terminal;
[0063] Step 206, calculate the time difference between the reservation control time and the current time, that is, Δt=T C -T 0 ,T c Control time for appointment, T 0 is the current time, Δt is the time difference;
[0064] Step 208, judging the size of the network delay and the time difference, when the network delay is greater than the time difference, perform step 212; when the network delay is less than or equal to the time difference, perform step 210;
[0065] Step 210, calculate the second sending time for sending the control instruction to the power consumption management terminal according to the res...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com