Transition method for active phase-oriented arterial road coordinate signal control scheme
A control scheme and a technology for coordinating signals, applied in the direction of controlling traffic signals, etc., can solve problems such as the inability to start the transition process immediately, the increase in the duration of the transition process, and the failure of the solution method for the transition green light time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0113] Taking a certain intersection implementing coordinated signal control as an example, the specific implementation manner of the present invention is introduced.
[0114] The time when the scheme switching command is issued TP=16:30:16
[0115] 1. Phase setting and phase display sequence
[0116] The phase settings and phase display order taken by the example intersection, such as figure 2 , 3 shown. Aspect K5 is the key coordination aspect.
[0117] 2. Dominant Phase Chain and Dominant Phase
[0118] A total of 17 dominant phase chains
[0119] 1) K5→K12→K3→K8
[0120] 2) K5→K12→K3→F2
[0121] 3) K5→K12→K9→K2
[0122] 4) K5→K12→K9→F4
[0123] 5) K5→K12→K4→K8
[0124] 6) K5→K12→K4→F2
[0125] 7) K5→K1→F4
[0126] 8) K11→K6→K3→K8
[0127] 9) K11→K6→K3→F2
[0128] 10) K11→K6→K9→K2
[0129] 11) K11→K6→K9→F4
[0130] 12) K11→K7→F2
[0131] 13) F1→K12→K3→K8
[0132] 14) F1→K12→K9→K2
[0133] 15) F1→K12→K4→K8
[0134] 16) F3→K6→K3→K8
[0135] 17) F3→K6→K9→...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com