Rapid construction method for elastic supporting block type monolithic track bed

A technology of integral ballast bed and elastic support, which is applied in the direction of roads, tracks, and ballast layers, can solve the problems of low rail assembly speed, non-straight expansion joints, and low hoisting efficiency, and achieve good social and economic benefits and improve Construction efficiency and the effect of improving hoisting efficiency

Inactive Publication Date: 2020-09-11
CHINA RAILWAY SIXTH GROUP +1
View PDF11 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction of the existing integral ballast bed, especially in the tunnel, the space is relatively limited, the assembly spacing of the support blocks is not equal, and the hoisting efficiency is also low, which leads to the problem that the assembly speed of the rail row is not high; the arrangement of the expansion joints In the process, there is sometimes the problem that the expansion joints are not straight; when the local pump is poured, there is also the problem of frequent pipe blockage

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid construction method for elastic supporting block type monolithic track bed
  • Rapid construction method for elastic supporting block type monolithic track bed
  • Rapid construction method for elastic supporting block type monolithic track bed

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The present invention will be further described below in conjunction with specific examples.

[0038] A rapid construction method of an elastic supporting block type integral ballast bed, comprising the following steps:

[0039] (1) Construction preparation: Before construction, conduct penetration measurement in the construction range of the ballast bed and adjacent sections, and start construction after adjusting and closing the center line and elevation;

[0040] (2) Transportation and placement of steel bars and support blocks: Place steel bars and support blocks along both sides of the ditch to ensure that they do not affect the construction passage, and at the same time meet the requirements for hoisting when assembling rail rows;

[0041] (3) Measuring and setting out: measure and set out the center line of the track and the four side pile points of the formwork on the inverted arch filling layer every other length of the track bed slab through the CPII control p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a rapid construction method for an elastic supporting block type monolithic track bed, and relates to the field of construction of monolithic track beds in tunnels. After construction preparation, transporting and placing steel bars and supporting blocks, then surveying and setting out, roughening a bottom plate, and planting the steel bars; laying and binding lower-layer reinforcing steel bars, and placing upper-layer reinforcing steel bars; assembling, hoisting and roughly adjusting the track panel; binding upper-layer reinforcing steel bars; mounting a template; mounting expansion joint plates; finely adjusting and fixing the track panel; then carrying out insulation performance test, ballast bed concrete pouring, tamping, surface finishing and curing; and finally, dismounting the track bent frame, and dismounting the support and the template. Gantry crane construction is conducted, and limited space is reasonably utilized for construction of all procedures;the movable assembling platform solves the problem that the assembling distances of the supporting blocks are unequal; the supporting block hoisting device improves the hoisting efficiency and accelerates the track panel assembling speed; the expansion joint steel plate ensures the straightness of the expansion joint; a surface finishing tool solves the problem of the gradient of a concrete surface. According to the construction method, the construction procedures are scientifically arranged, connection is tight, and the construction quality is guaranteed.

Description

technical field [0001] The invention relates to the construction field of integral ballast beds in tunnels, in particular to a rapid construction method for elastic supporting block type integral ballast beds, which is suitable for the construction of elastic supporting block type integral ballast beds in tunnels using gantry cranes. Background technique [0002] In the construction of the existing integral ballast bed, especially in the tunnel, the space is relatively limited, the assembly spacing of the support blocks is not equal, and the hoisting efficiency is also low, which leads to the problem that the assembly speed of the rail row is not high; the arrangement of the expansion joints In the process, there is sometimes the problem that the expansion joints are not straight; when the ground pump is poured, there is also the problem of frequent pipe blockage. Therefore, in order to solve the above problems, it is necessary to improve the existing construction method. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01B1/00E01B2/00
CPCE01B1/00E01B2/00
Inventor 胡肖肖张志恒王富强路遥刘晓欢高新刚段英杰
Owner CHINA RAILWAY SIXTH GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products